Septic tank×オガワ創研 - メーカー・企業と製品の一覧

Septic tankの製品一覧

1~4 件を表示 / 全 4 件

表示件数

On-site purification treatment system Combined purification tank for 7-person tank PPP-7 Construction specifications

Standard specifications and floor plans and cross-sectional views for parking lot specifications. Specifications for a combined septic tank for 7 people.

Ogawa Souken is engaged in the construction and sale of purification tanks, as well as the manufacturing and sale of on-site treatment devices PPP (Sleepy), various wastewater treatment, general development of self-generating power devices, and development of rainwater infiltration tanks. This document is the "Construction Specifications for On-Site Purification Treatment Device Combined Purification Tank for 7 People PPP-7." It includes the specifications for PPP-7, as well as floor plans and cross-sectional views for standard specifications and parking lot specifications. Please use this information for product consideration and other purposes. [Contents] ■ PPP-7 Specifications ■ Standard Specification Floor Plan S 1:30 ■ Standard Specification Cross-Sectional View S 1:30 ■ Parking Lot Specification Floor Plan S 1:30 ■ Parking Lot Specification Cross-Sectional View S 1:30 *For more details, please refer to the PDF document or feel free to contact us.

  • Water Treatment

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録

[Construction Example] PPP-180 Restaurant (Oyama City, Tochigi Prefecture)

Drainage treatment of 36 tons per day is now possible! We will introduce examples of construction in areas without sewage systems.

We would like to introduce the installation of "PPP-180" at a restaurant in Oyama City, Tochigi Prefecture. Although it is relatively in the city center, the location does not have access to sewage, so "PPP-180" was introduced for the construction of the restaurant. After installation, it became possible to treat wastewater at a rate of 36 tons per day, accommodating 180 people. This also led to a reduction in construction time and budget. 【Background for the Installation】 - Although it is relatively in the city center, there is no sewage system. - The work request came from a purification tank manufacturer who received the order from the main contractor. - Construction period: 1 week - Number of workers: 3 *For more details, please refer to the PDF document or feel free to contact us.

  • Water Treatment

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録

On-site purification treatment system Combined purification tank for 10 people PPP-10 construction specifications

Standard specifications, floor plans, and cross-sectional drawings for parking lot specifications. Specifications for a combined septic tank for 10 people.

Ogawa Souken is engaged in purification tank construction and sales, as well as the manufacturing and sales of on-site treatment devices PPP (Sleepy), various wastewater treatment, general self-generating power device development, and rainwater infiltration tank development. This document is the "On-Site Purification Treatment Device Combined Purification Tank for 10 People PPP-10 Construction Specifications." It includes specifications for the PPP-10, such as inflow water volume and treatment capacity, as well as floor plans and cross-sectional views for standard specifications and parking lot specifications. Please use this information for product consideration and other purposes. [Contents] ■ PPP-10 Specifications ■ Standard Specification Floor Plan S 1:30 ■ Standard Specification Cross-Sectional View S 1:30 ■ Parking Lot Specification Floor Plan S 1:30 ■ Parking Lot Specification Cross-Sectional View S 1:30 *For more details, please refer to the PDF document or feel free to contact us.

  • Water Treatment

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録

[Construction Case] PPP-30 Convenience Store Renovation Project (Tochigi Prefecture)

Up to 15 tons of wastewater treatment can be done in one day! Here are examples of construction in locations where there is no discharge destination for wastewater.

We would like to introduce the construction results of the convenience store renovation project (Tochigi Prefecture) where "PPP-30" was implemented. In a location without a drainage outlet, "PPP-30" was introduced for the construction of the convenience store due to the absence of sewage treatment. After the construction, it became possible to process wastewater for 30 people, enabling a treatment capacity of 15 tons per day. Additionally, this led to a reduction in construction time and budget. 【Background Leading to Implementation】 - There was no sewage treatment in a location without a drainage outlet when constructing the convenience store. - Construction period: 3 days - Number of workers: 3 *For more details, please refer to the PDF document or feel free to contact us.

  • Water Treatment

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録